• <menu id="888u4"><menu id="888u4"></menu></menu>
    • English
    • ???????
    • 中文
    • Fran?ais
    • Русский
    • Espa?ol

    You are here

    Development and Application of Level 2 Probabilistic Safety Assessment for Nuclear Power Plants

    IAEA Safety Standards Series No. SSG-4 (Rev. 1)
    Specific Safety Guide

    English STI/PUB/2105 | 978-92-0-137424-0

    172 pages | 4 figures | € 68.00 | Date published: 2025

    https://doi.org/10.61092/iaea.buld-d6ia

    Download PDF (2.74 MB)

    Description

    Probabilistic safety assessments (PSAs) are recognized as an important tool for assessing the level of safety for nuclear power plants (NPPs). In particular, the Level 2 PSA for NPPs provides key insights about the potential radioactive releases that could affect the workers, the public and the environment following a severe accident. The purpose of this Specific Safety Guide is to provide an updated internationally accepted methodology for the development of a high-quality Level 2 PSA for NPPs. The revised Specific Safety Guide is intended for use by designers, operating organizations, technical support organizations and regulatory bodies in the development, application and independent review of Level 2 PSAs. The revised Safety Guide is also intended for use in connection with both the review for authorization (licensing) of the construction and the operation of new NPPs and the safety re-evaluation of existing NPPs during periodic safety reviews and modifications.

    More Information on reusing IAEA copyright material.

    Keywords

    Development, Application, Level 2, Probabilistic Safety Assessment, Nuclear Power Plants, PSAs, Nuclear Power Plants, Safety, Radioactive Releases, Severe Accident, Specific Safety Guide, Methodology, Designers, Operating Organizations, Technical Support Organizations, Regulatory Bodies, Development, Application, Independent Review, Authorization, Licensing, Construction, Operation, Safety Re-evaluation, Periodic Safety Reviews, Modifications, Nuclear Reactors, Safety Measures, Risk Assessment

    Related publications

    Stay in touch

    Newsletter

    午夜爱爱爱爱爽爽爽视频网站